The Pantai 2 Sewage Treatment Plant (STP) is a green transformation project where Geotube® dewatering technology was used for the cleanout of its existing aeration lagoon prior to redevelopment of the treatment plant.
An interesting agriculture case study where two environmental systems were put in place. Discover how TenCate Geotube® dewatering technology and TenCate Geotube® Silt Curtain played a role in the recovery of consolidated rich POME sludge.
Every soft site closure brings with it a series of unique challenges and this project is a case in point with three different locations requiring specific solutions. Read more.
A gold mine located on a remote island of Indonesia required heavily silted settling ponds to be dredged. The sediment in the ponds contained valuable gold deposits worth recovering and re-processing. Read more about it.
The versatility of TenCate Geotube® dewatering technology in solving typical mine operational issues in a practical and economical way. Read more about it.
It is definitely possible to successfully install and operate large water management tubes over extremely soft substrates. Find out more in this case study.
In a remote territory of Kalimantan, where logistics are seemingly impossible, lies Asia's longest Geotube® dewatering unit - designed for a mine site which required high volumes of slurry to be dewatered.
In a first of its kind application in Australia, customized panels of Mirafi® PET2000/100 geotextiles were installed as reinforcement in this harbour seawall restoration project.
Manila Bay’s environment has been deteriorating at an alarming rate with severe pollution. The first phase of the project is to clean and reduce the water pollutants of Manila Bay which involves massive dredging and sediment control.
The Bago-Aplaya Section facing Davao Gulf towards Talomo is an elevated highway with a 90 degree vertical slope on both sides. Read about the stabilization and reinforcement solutions of the slope embankment.