There was only 10 months of construction time to get the Ciudad de Victory Interchange overpass bridge and bypass road ready in time to provide direct access to the Philippine Arena for the 30th SEA Games.
The Clark International Airport serves as an alternative to the main airport in Metro Manila. A waterway revetment is required to serve as a catch basin for water run-off within the airport and erosion protection measures are required.
Processing and refining rare earth minerals results in a waste stream that is required to be managed and stored in an environmentally secure way. Read about how slurry from the refining process is dewatered.
The biggest Geotube® Dewatering project in Asia for the cleanout of coal mine settling ponds. See 7 stack layers of Geotube® dewatering tubes in action!
The Sotiel Coronda mining complex is located at Calanas in the province of Huelva (Andalucia), Southwest Spain. Following completion of mining and processing activities in the area, the reclamation and closure of the large pyrite tailing ponds was decided.
Industrial wastes are typically in slurry form and may contain large amounts of contaminants that requires proper management and disposal in an environmentally acceptable manner. This often requires dewatering, then deposition at a secured landfill.
In a first of its kind application in Australia, a specially designed remote-controlled underwater dredger was deployed to excavate and clean out a blocked stormwater drain discharging into the Brisbane river.
Beaches erode due to the continuous exposure to external forces such as currents and waves. To prevent beach erosion, breakwater structures are constructed to reduce the wave energy that approaches the shore.
The Davao City coastal road bypass project will traverse from Roxas Avenue to Bago Aplaya, cutting through NHA Kadayawan Homes, Matina Aplaya, and Bolton Isla. This project won the 2019 IFAI IAA Award of Excellence.
By 2012 it was clear that Xinfeng Landfill was quickly running out of capacity. There was an urgent need to find a way to increase the capacity of Xinfeng Landfill, without which Xinfeng Landfill would have to stop accepting waste. Discover the solution.